Rim Rock Drive CO FTNP COLM10(3)

Project Type

Aggregates

Asphalt Paving

Construction

Excavation

Reclamation

Location

Colorado National Monument

Products

Construction Services

Owner: Federal Highway Administration
General Contractor: United Companies
Materials Used on Project and Quantities:

  • Sub-excavation – 1,270 cy
  • Borrow – 5,100 cy
  • Embankment – 4,000 cy
  • Geosynthetic fabric – 4,875 sy
  • Base course
  • Full-depth reclamation – 4.5 miles
  • Asphalt pavement – 12,440 ton
  • Storm drainage
  • Concrete curb – 3,000 lf
  • Concrete paving
  • Guard rail system – 4,157 lf

This project consisted of a full-depth reclamation for 4.5 miles, base course installation, asphalt placement, concrete curb replacement, concrete paving, and installation of a guardrail system. This project is located at the East Entrance of the Colorado National Monument.