Rim Rock Drive CO FTNP COLM10(3)
Project Type
Aggregates
Asphalt Paving
Construction
Excavation
Reclamation
Location
Colorado National Monument
Products
Construction Services
Owner: Federal Highway Administration
General Contractor: United Companies
Materials Used on Project and Quantities:
- Sub-excavation – 1,270 cy
- Borrow – 5,100 cy
- Embankment – 4,000 cy
- Geosynthetic fabric – 4,875 sy
- Base course
- Full-depth reclamation – 4.5 miles
- Asphalt pavement – 12,440 ton
- Storm drainage
- Concrete curb – 3,000 lf
- Concrete paving
- Guard rail system – 4,157 lf
This project consisted of a full-depth reclamation for 4.5 miles, base course installation, asphalt placement, concrete curb replacement, concrete paving, and installation of a guardrail system. This project is located at the East Entrance of the Colorado National Monument.